Winter shipments in the chemical industry are among the most demanding periods in logistics. The same consignment often asks for two things at once: carriage under dangerous goods rules, and a temperature that must not fall below a given threshold. Combining both in a single shipment is not the job of a standard run. It takes people, equipment and planning.
At aktif trans we treat this work as a service level of its own. Below we explain what that means and what changes in the winter months.
Three service levels
Not every consignment calls for the same care. We define our service at three levels, and we agree at the quotation stage which consignment belongs to which level. We give the levels names rather than numbers: numbering is easily confused with the way industry standards such as TAPA count their own tiers.
Pharma and high value. Two drivers, routing via secure parking, dedicated tracking and round-the-clock contact. Consignments under a TAPA regime run at this level.
ADR and temperature-controlled transport. Certified driver, temperature-controlled equipment, shipment-specific documentation.
Line haul. Standard groupage and full loads, fixed line, scheduled departure, known transit time.
The ADR and temperature-controlled level and the pharma and high-value level apply on the road as much as on the sea leg. Most chemical winter shipments run at the ADR and temperature-controlled level, some at pharma and high value.

Premium is not only the equipment, it is the crew
When winter shipments come up, the first thought is the trailer: is there a reefer unit, does the heating work. Equipment matters, but equipment can be bought. The real difference lies with the person driving the vehicle.
ADR is the driver's own certificate. Without SRC5 nobody may carry that load, and the certificate comes through training, examination and renewal. Temperature control, by contrast, is not a separate licence class; ATP certifies the vehicle, not the driver. That is why reefer work runs on experience: on a driver who reads the temperature record, checks the unit at the border, and chooses the place and time of the rest break accordingly.
Combining both qualifications in one person is not easy, and that is exactly why this crew is valuable. In Europe, the IRU 2025 report counts more than 502,000 unfilled driver positions, a vacancy rate of 13 percent; a further 660,000 drivers will retire by 2030. The Schengen rule of 90 days in any 180 affects, according to the September statement by the Turkish international hauliers association, roughly 25,000 of the some 50,000 Turkish international drivers directly. Loading, unloading and waiting at the border count against those days as well.
Qualified drivers are therefore a scarce resource everywhere in the industry. Putting that resource on the right job at the right time is a planning discipline, and that is precisely what we mean by premium.
Why temperature control is not negotiable
With water-based products such as paint, dispersion, adhesive, resin and latex, freezing damage cannot be repaired. The manufacturers' technical data sheets are explicit: these products are not stored below +5 °C. Freezing water expands and, as it does, breaks up the binder and the polymer particles. Even a thin layer of ice at the edge of the container can render the load unusable. There is no load that thaws on arrival and becomes what it was.
We therefore treat the temperature requirement not as a preference but as a technical specification of the shipment. We ask for it at the quotation stage, write it into the plan and monitor it en route.

What we watch in winter planning
The temperature requirement is settled at the quotation stage. A +5 °C requirement that surfaces on the loading day usually fails not on the vehicle but on the lack of a suitable driver. If we know from the outset, we reserve the crew accordingly.
Where ADR and temperature meet, the shipment needs a crew plan. We plan it not as an ordinary run but as the ADR and temperature-controlled level; the time buffer is allowed for here.
Waiting at the border is part of the driver's calendar. In our own measurement in October, 3,132 trucks were queuing at Kapikule at the same moment. We count that time not only as transit but as crew planning.
Packaging and palletising are discussed. Containers in the outer row of a pallet cool down far faster than those in the middle. The loading pattern is part of temperature management.
You get a clear yes or no at the start. We say what we can do, and also what we cannot. An uncertainty that appears after the product has been packed helps nobody.
Pre-loading checklist
We go through the following list together on every ADR and temperature-controlled shipment. Most items are familiar on their own; the problem usually arises when one of them is skipped. You are free to use the list in your own operation.

Documents
The safety data sheet is current and matches the product loaded. Revision date and product name are checked against the label.
The dangerous goods transport document is complete. Proper shipping name, UN number, class, packing group, tunnel restriction code and total quantity.
The IMO declaration is stamped and signed. Where there is a sea leg, together with the container or vehicle packing certificate.
The instructions in writing are in the cab. In a language the driver understands, within reach.
The driver's ADR certificate is valid. SRC5 and expiry date; the driver's remaining 90 of 180 days are checked here as well.
Vehicle and equipment papers are valid. Where required, the vehicle's ADR certificate of approval, and the ATP certificate for temperature-controlled equipment.
Vehicle and equipment
Orange plates and placards are correct and legible. Where nothing is being carried they are covered; a soiled or missing placard stops the vehicle in the field.
Fire-fighting equipment is complete. Above 7.5 tonnes, 12 kg in total with at least one 6 kg extinguisher, plus 2 kg in the cab; seal and inspection date are legible.
The ADR equipment is complete. One wheel chock per vehicle, two self-standing warning signs, and for each crew member a warning vest, a portable lamp, protective gloves and eye protection.
Label-dependent additional equipment is on board. Eye rinsing liquid for classes 3 to 9; an emergency escape mask for 2.3 and 6.1; a shovel, a drain seal and a collecting container for 3, 4.1, 4.3, 8 and 9.
Load securing and segregation are checked. Loading pattern, mixed loading prohibitions, securing.
Temperature
The reefer unit is tested before departure. Function test, fuel level, door seals.
The vehicle is conditioned before loading. It is brought to the set temperature; warm goods do not go into a cold trailer, nor cold goods into a warm one.
The data logger is fitted and started. The set range is visible on the load, for example +5 °C to +25 °C.
Checks continue at every stop. At every break, at every loading and unloading, at every wait at the border: is the unit running, is it holding the set temperature, is there enough fuel. The check does not end at departure.
The loading pattern is part of temperature management. The outer row of a pallet cools faster; space is left for air circulation.
The list is available as a printable one-page PDF:
If you find an item missing from the list, write to us and we will add it.
An open question to the industry
While preparing this article we looked for an answer to a simple question: how many of the 25,000 drivers affected by the 90 of 180 rule hold an ADR certificate? We found no published figure. Turkey is said to have 1.2 million SRC certificates, but nowhere is it stated separately how many of those are SRC5. For temperature control there is no separate certificate class at all.
That detail shows how special the qualification is: the industry does not even count its scarcest resource. If anyone holds an official or association figure, please share it; we will publish it and name the source.
A shipment-specific solution instead of a standard tariff
aktif trans does not apply a standard tariff to ADR and temperature-controlled shipments. In view of recent developments we have suspended our standard price list for them.
The reason is simple: cost here is not determined by distance. The nature of the load, the required temperature range, the waiting times along the route and the availability of a crew able to do the work on that date differ with every shipment. A tariff calculated from averages either overcharges the customer or leaves the carrier alone in the field.
We therefore assess every enquiry individually and build you a solution specific to that shipment: with which equipment, at which service level, with which crew and on which schedule. The price is then discussed on top of that solution.
Let us talk about your winter shipments
If your chemical load falls under ADR, carries a temperature requirement, or both at once, let us agree together at which service level we will run the shipment. It is enough to tell us the nature of the load, the temperature range, and the place of departure and destination.